The longest leg, but also the most direct when considering sea transportation between Europe and the United Arab Emirates*. As the solar panels arrived in Jebel Ali, they were kept in their sea container and loaded directly onto a chassis and trucked to the pavilion project’s warehouse.
And as simple as that last leg might seem, it was the final layer of security to reduce handlings by keeping the solar panels in the certified packaging until the final consignee could receive them with a seal number on the bill of lading.
*as long as the red sea crisis continues to impact sea transportation, the most direct route between Rotterdam and Jebel Ali is currently around the Cape of Good Hope.